Immanuel
Baptist Church was created in three phases.
Phase I included the design and construction of the 4,500 square
foot sanctuary and narthex.
Phase II proposed a Master plan for future growth of the church.
Phase III concluded the expansion with the addition of an 8,000
square foot two story, stone veneer wing. This wing included
four nursery stations, twelve classrooms, a Pastor's study,
and two assembly rooms.